The Design & Manufacturing of Key Infrastructure across EXPO 2020
Featured in this months edition of TPMEA Magazine, turn to page 58 to read about the modular buildings which Spacemaker designed and manufactured across the EXPO 2020 site.
With construction starting in 2018 and the finished product unveiled in 2020, Spacemaker designed, manufactured and installed 12 operation pavilions as well as two metro plazas.
Click here to read the full article featured in this months TPMEA.
News categories
Related News
-
Spacemaker Delivers EXPO 2020 Headquarters
Date: 31/01/16